
Office Relocation With Minimal Downtime
Office relocation for SMEs: IT workstations, files and furniture moved over a weekend so the business runs on Monday.
An office relocation is a different problem from a house move, because the clock matters more than the address. The phone system, workstations and filing need to be standing at the new site before the first client calls on Monday morning or the first employee logs in. For an international company setting up or expanding in the Zurich area, that also means dealing with Swiss building practicalities that are easy to underestimate from abroad: loading zones on public streets usually require a permit, lifts in shared office buildings have to be booked with the caretaker, and access to a new site outside normal hours needs arranging with the property manager well before moving day.
Because of that, we plan office relocations across March SZ, the Zürcher Oberland and the Wil SG area mostly outside business hours, in the evening or over a weekend. How long that takes depends on scale: a single office with four workstations is done in an evening, while a larger administration with several departments needs a full weekend and more than one vehicle. All three regions have a strong base of SMEs, from small trades businesses to larger employers such as Ferag in Hinwil or Huber+Suhner in Pfäffikon ZH, so office volumes and requirements vary a great deal from one relocation to the next.
How we keep the business running
Before the move, we visit both sites and agree a labelling system with you, giving every department and room its own colour or number. On moving day we dismantle desks, shelving and filing cabinets, photograph and label patch panels, switches and cabling at the server cabinet before anything is disconnected, and pack screens and equipment for transport. At the new site, furniture goes back up according to the same room plan, desk systems and shelving are reassembled, and filing cabinets are restocked by label. The technical reconnection of servers and networking is handled with your IT provider, and we make sure the equipment itself is in the right place at the agreed time for that to happen.
For larger offices we often stagger the move by department: accounts moves on Friday evening, reception and management follow on Saturday, so the whole business is never without a workspace at once. Where a full weekend is not enough time, we set up temporary workstations at the new site in advance with the essentials, so urgent calls and emails can still be answered first thing Monday.
Where office moves go wrong
The most common mistake is too little time between the last box leaving the old office and the first meeting at the new one. If IT reconnection, property maintenance at the new building and the furniture move are not scheduled together, the furniture is in place on Monday but nobody can log in. Labelling is underestimated just as often. Without a clear system, the accounts department’s files end up in the boardroom and vice versa, and the search afterwards costs more time than the move itself. On multi-floor buildings, lift and loading-zone logistics add another layer, similar to a residential high-rise move but with more boxes per floor and several departments competing for the same lift.
A further sticking point is access to the new building outside normal opening hours. A weekend move needs a key or access authorisation from the property management (Liegenschaft management) arranged in advance, or the van arrives on Saturday morning to a locked door. We check this during the site visit, not on the day.
Who this is for
We handle office relocations for SMEs, shared office and practice groups, law firms and property management companies across March SZ, the Zürcher Oberland and the Wil SG area. Above a certain volume, for example several floors or a whole section of a building, we work with established partner firms so the move still fits into a single weekend.
Quote and booking
The quote (Offerte) is based on a visit to both sites, the number of workstations and the preferred time window. For larger relocations we agree with you which partner firm covers which part of the building, so coordination still runs through a single point of contact on your side. The date is confirmed in writing, including the agreed window for IT reconnection and access to the new site.
Where we work
We take on office relocations from Siebnen for March SZ and the Höfe, from Hinwil for the Zürcher Oberland, from Wetzikon through Rüti and Uster to Pfäffikon ZH, and from our third location in Wil for the Wil SG area. For the finishing step after the move, cleaning the vacated offices for handover, the move-out cleaning service is the natural next booking.
Frequently asked questions
Can we move over the weekend so everything is ready on Monday?
Yes, that is the usual pattern for office relocations. We start dismantling on Friday evening after close of business and rebuild workstations at the new site over the weekend, so nobody arrives on Monday morning to find a moving box on their desk.
Who handles the server and network cabling?
We document and label cables and network connections before disconnecting anything, so reconnection is unambiguous. The technical reconnection of servers and the network itself is coordinated directly with your IT provider, since that stays their responsibility.
How do you stop files and documents getting mixed up?
Every department and room gets its own colour and number system for boxes and furniture. The same room label appears on the door at the new site, so every box finds its place without anyone having to search for it.
What happens with a large office spread over several floors?
Above a certain size we bring in established partner firms, so several floors or sections of a building can be handled at the same time. Planning and your point of contact stay the same throughout.
How far in advance should we plan an office relocation?
Six to eight weeks is a reasonable lead time for a weekend move, especially if the IT provider, landlord and property maintenance (Hauswartung) at the new site all need coordinating. Smaller, single-department moves can often be arranged with less notice.
Do we need a parking permit for the moving truck outside our building?
Often yes, particularly in town centres or where the office fronts a public street with no private loading bay. We check this during the site visit and apply for any permit needed, so the truck is not turned away on the day.
We take a look and give you a fixed price.
The inspection is free and without obligation. After that you know the price, and the price stays.